Network Rail Engineering work

Engineering WorkThis page contains details of planned Network Rail engineering work.

Please note we are unable to guarantee the carriage of bicycles on rail replacement bus services.

To check if engineering work will affect you please use the journey planner on our live running information page.

Filter engineering work

 

Clear filter

Latest updates

 

Engineering work starting on 19/05/13 between Faversham and Canterbury East.

Track improvements and maintenance are taking place from 02:00 on 19/05/13 to 04:00 on 20/05/13 between Faversham and Canterbury East.

There are no train services operating between Faversham and Canterbury East or calling at Selling. However, there are replacement bus services operating in each direction between Faversham and Canterbury East; and Faversham and Selling. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Adisham, Aylesham, Bekesbourne, Bromley South, Chatham, Dover Priory, Farningham Road, Gillingham -Kent-, Kearsney, London Victoria, Longfield, Meopham, Newington, Rainham, Rochester, Shepherds Well, Sittingbourne, Snowdown, Sole Street, St Mary Cray, Swanley or Teynham.

Engineering work starting on 19/05/13 between London Charing Cross and London Bridge.

Track improvements and maintenance are taking place from 01:10 on 19/05/13 to 04:00 on 20/05/13 between London Charing Cross and London Bridge.

As a result of this work, all train services scheduled to operate from London Charing Cross will operate as scheduled to London Bridge before being diverted into London Cannon Street. Passengers for London Waterloo East or London Charing Cross should travel to London Cannon Street and change for a train service that operates every 15 minutes in each direction between London Cannon Street, London Waterloo East and London Charing Cross.

Engineering work starting on 25/05/13 between Blackheath and Dartford.

Track improvements and maintenance are taking place from 00:50 on 25/05/13 to 02:30 on 26/05/13 between Blackheath and Dartford.

There are no train services calling at -in alphabetical order- Barnehurst, Bexleyheath, Eltham, Falconwood, Kidbrooke or Welling. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham, Blackheath and Dartford. Also, London Victoria to Dartford services will not run, so passengers planning to travel to or from London Victoria can do so via London Underground services between London Bridge and London Victoria. Valid train tickets will be accepted for travel in either direction and by any reasonable route between London Bridge and Victoria underground stations. Passengers who wish to travel between Lewisham, Nunhead, Peckham Rye and Denmark Hill can travel in either direction between Lewisham and Nunhead on local bus route. Valid train tickets will be accepted for travel in ether direction on bus route 484 between Lewisham and Nunhead.

Engineering work starting on 25/05/13 between Dover Priory and Ramsgate.

Track improvements and maintenance are taking place from 00:35 on 25/05/13 to 04:50 on 26/05/13 between Dover Priory and Ramsgate.

There are no train services calling at -in alphabetical order- Deal, Martin Mill, Sandwich or Walmer. However, there are replacement bus services, calling at these stations, operating in each direction between Dover Priory and Ramsgate. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Ashford International, Folkestone Central, Folkestone West, Headcorn, Hildenborough, London Bridge, London Charing Cross, London Waterloo East, Marden, Orpington, Paddock Wood, Pluckley, Sandling, Sevenoaks, Staplehurst, Tonbridge or Westenhanger.

Engineering work starting on 26/05/13 between Lewisham and Barnehurst.

Track improvements and maintenance are taking place from 02:30 on 26/05/13 to 02:30 on 27/05/13 between Lewisham and Barnehurst.

Lewisham station is closed and there are no train services calling at -in alphabetical order- Barnehurst, Bexleyheath, Blackheath, Eltham, Falconwood, Kidbrooke or Welling. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham and Dartford. There are also replacement buses operating between New Cross and Hither Green calling at St Johns and Lewisham. Passengers travelling between Ladywell and Lewisham can travel on local bus routes P4 or 284. Valid train tickets will be accepted for travel in ether direction on these bus routes between Ladywell and Lewisham. As a further result of this work, there are no train services operating between Blackheath and Charlton, and London Charing Cross/Gillingham services are diverted to operate via Greenwich and will not call at Lewisham or Blackheath. Passengers who wish to travel between Blackheath and Charlton can do so via Docklands Light Railway -DLR- between Lewisham and Greenwich. Valid train tickets will be accepted for travel ion the DLR, in ether direction, between Lewisham and Greenwich. This engineering work will affect almost all Metro train services operating to and from London Charing Cross.

Engineering work starting on 26/05/13 between London Victoria and Herne Hill.

Track improvements and maintenance are taking place from 01:30 on 26/05/13 to 03:15 on 27/05/13 between London Victoria and Herne Hill.

London Victoria Station is closed to Southeastern train services. As a result, London Victoria/Orpington Metro services are diverted to operate from London Blackfriars, but will not call at Brixton. Passengers planning to travel to or from London Victoria can travel between London Blackfriars and London Victoria by London Underground services. Passengers who wish to travel to or from Brixton can also use underground services. Valid train tickets will be accepted for travel, in either direction between Blackfriars, Victoria, Brixton and Elephant & Castle underground stations.

Engineering work starting on 26/05/13 between London Victoria and Denmark Hill.

Track improvements and maintenance are taking place from 01:30 on 26/05/13 to 03:15 on 27/05/13 between London Victoria and Denmark Hill.

London Victoria Station is closed to Southeastern train services. As a result all Mainline services will be diverted to operate from London Cannon Street calling additionally at London Bridge, but will not call at Bromley South. Passengers who wish to travel to or from Bromley South can do so by changing at Swanley for Metro train services. Passengers travelling to or from London Victoria can travel on London underground services from London Bridge or London Cannon Street. Valid train tickets will be accepted for travel, in either direction and by any reasonable route between Cannon Street, London Bridge and Victoria underground stations. This engineering work will affect all Mainline train services normally scheduled to operate from London Victoria.

Engineering work starting on 26/05/13 between Headcorn and Ashford International.

Track improvements and maintenance are taking place from 01:00 on 26/05/13 to 04:00 on 27/05/13 between Headcorn and Ashford International.

Buses will replace train services between Headcorn and Ashford International. As a result certain London Charing Cross/Ramsgate via Tonbridge services are diverted between London Bridge and Ashford International and will call additionally at Chislehurst -for connections with Orpington-, Otford -for connections with Sevenoaks- and Maidstone East. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Canterbury West, Chartham, Chilham, Deal, Dover Priory, Folkestone Central, Folkestone West, Hildenborough, London Bridge, London Waterloo East, Marden, Martin Mill, Minster, Paddock Wood, Pluckley, Sandling, Sandwich, Staplehurst, Sturry, Walmer, Westenhanger or Wye.

Engineering work starting on 27/05/13 between Blackheath and Dartford.

Track improvements and maintenance are taking place from 02:30 on 27/05/13 to 04:00 on 28/05/13 between Blackheath and Dartford.

There are no train services calling at -in alphabetical order- Barnehurst, Bexleyheath, Eltham, Falconwood, Kidbrooke or Welling. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham, Blackheath and Dartford. This engineering work may also affect journeys to and from the following stations: London Bridge, London Charing Cross, London Waterloo East or New Cross. PLEASE NOTE: these alterations are based upon a Sunday timetable.

Engineering work starting on 27/05/13 between Tonbridge and Paddock Wood.

Track improvements and maintenance are taking place from 01:50 on 27/05/13 to 13:55 on 27/05/13 between Tonbridge and Paddock Wood.

Until approximately 13:55, buses will replace train services between Tonbridge and Paddock Wood. As a result, certain London Charing Cross/Ramsgate via Tonbridge services are diverted between London Bridge and Ashford International and will call additionally at Chislehurst -for connections with Orpington-, Otford -for connections with Sevenoaks- and Maidstone East. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Ashford International, Canterbury West, Chartham, Chilham, Deal, Dover Priory, Folkestone Central, Folkestone West, Headcorn, Hildenborough, London Bridge, London Waterloo East, Marden, Martin Mill, Minster, Pluckley, Sandling, Sandwich, Staplehurst, Sturry, Walmer, Westenhanger or Wye. PLEASE NOTE: these alterations are based upon a Sunday timetable.

Engineering work starting on 27/05/13 between Tonbridge and Tunbridge Wells.

Track improvements and maintenance are taking place from 01:50 on 27/05/13 to 13:55 on 27/05/13 between Tonbridge and Tunbridge Wells.

Until approximately 13:55, there are no train services operating between Tonbridge and Tunbridge Wells or calling at High Brooms. However, there are replacement bus services operating in each direction between Tonbridge and Tonbridge Wells calling at High Brooms. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Battle, Crowhurst, Etchingham, Frant, Hastings, London Bridge, London Charing Cross, London Waterloo East, Orpington, Robertsbridge, Sevenoaks, St Leonards Warrior Square, Stonegate, Wadhurst or West St Leonards. PLEASE NOTE: these alterations are based upon a Sunday timetable.

Engineering work starting on 20/05/13 between Sittingbourne and Dover Priory.

Track improvements and maintenance are taking place from 00:20 on 20/05/13 to 04:20 on 24/05/13 between Sittingbourne and Dover Priory.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICE - THE 23:12 St Pancras International to Ramsgate via Dover Priory -FRIDAY ONLY-. This train service will terminate at Dover Priory at 00:18. However, there is a connecting replacement bus service that departs from Dover Priory at 00:26 and sets down passengers only at Deal 00:54, Sandwich 01:09 and terminates at Ramsgate at 01:27. - THE 23:25 St Pancras International to Faversham -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service will terminate at Sittingbourne at 00:22. However, there is a connecting replacement bus service that departs from Sittingbourne at 00:30 and terminates at Faversham at 00:46. - THE 23:55 St Pancras International to Faversham -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service will terminate at Sittingbourne at 00:52. However, there is a connecting replacement bus service that departs from Sittingbourne at 01:00 and terminates at Faversham at 01:16.

Engineering work starting on 20/05/13 between Sittingbourne and Herne Bay.

Track improvements and maintenance are taking place from 00:20 on 20/05/13 to 04:20 on 24/05/13 between Sittingbourne and Herne Bay.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICE - THE 23:22 London Victoria to Ramsgate -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service will terminate at Sittingbourne at 00:28. However, there are two replacement bus services continuing on to Ramsgate as follows: A 'limited stop' replacement bus service departs from Sittingbourne at 00:36 and calls at Faversham 00:52, Margate 01:27, Broadstairs 01:34, Dumpton Park 01:37 and terminates at Ramsgate at 01:42; OR an 'all stations' replacement bus service departs from Sittingbourne at 00:37, and calls at Teynham 00:44, Faversham 00:55, Whitstable 01:12, Chestfield & Swalecliffe 01:17, Herne Bay 01:22, Birchington-on-Sea 01:38, Westgate-on-Sea 01:42, Margate 01:48, Broadstairs 01:55, Dumpton Park 01:58 and terminates at Ramsgate at 02:03. - THE 00:10 London Victoria to Ramsgate -TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY-. This train service will terminate at Sittingbourne at 01:10.However, there are two replacement bus services continuing on to Ramsgate as follows: A 'limited stop' replacement bus service departs from Sittingbourne at 01:18 and calls at Faversham 01:34, Margate 02:09, Broadstairs 02:16, Dumpton Park 02:19 and terminates at Ramsgate at 02:24; OR an 'all stations' replacement bus service departs from Sittingbourne at 01:19, and calls at Teynham 01:26, Faversham 01:37, Whitstable 01:54, Chestfield & Swalecliffe 01:59 , Herne Bay 02:04, Birchington-on-Sea 02:20, Westgate-on-Sea 02:24, Margate 02s29, Broadstairs 02s36, Dumpton Park 02s39 and terminates at Ramsgate at 02:44. -note: s = stops to set down passengers only-.

Engineering work starting on 20/05/13 between Hither Green and Petts Wood.

Track improvements and maintenance are taking place from 23:05 on 20/05/13 to 05:00 on 24/05/13 between Hither Green and Petts Wood.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICE - THE 23:36 London Charing Cross to Orpington -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service will operate as scheduled to arrive at Lewisham at 23:52, but is retimed to depart Lewisham at 23:59, Hither Green 00:04, Grove Park 00:07, Elmstead Woods 00:11, Chislehurst 00:13, Petts Wood 00:16 and terminates at Orpington at 00:20.

Engineering work starting on 20/05/13 between Dartford and Gravesend.

Track improvements and maintenance are taking place from 00:45 on 20/05/13 to 04:20 on 24/05/13 between Dartford and Gravesend.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICE - THE 00:18 London Charing Cross to Gillingham -TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY-. This train service will terminate at Dartford at 01:06. However, there is a connecting replacement bus service to Gillingham that will depart from Dartford at 01:18, Greenhithe 01:27, Gravesend at 01:39, Higham 01:52, Strood at 02:01, Rochester 02:05, Chatham 02:10 and terminates at Gillingham at 02: 20.

Engineering work starting on 20/05/13 between London Victoria and Herne Hill.

Track improvements and maintenance are taking place from 00:20 on 20/05/13 to 04:50 on 24/05/13 between London Victoria and Herne Hill.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICE - THE 00:37 London Victoria to Gillingham -TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY-. This train service is revised to operate non-stop from London Victoria to Bromley South and will then operate as scheduled to Gillingham. Please note: this service WILL NOT CALL at Herne Hill, Penge East or Beckenham Junction. Passengers travelling to Herne Hill, Penge East, Beckenham Junction, or from these stations to Bromley South, St Mary Cray, Swanley, Farningham Road, Longfield, Meopham, Rochester, Chatham or Gillingham should travel by a replacement bus service. This replacement bus service departs from London Victoria at 00:40, calls at Herne Hill at 01:05, Penge East 01:20 and Beckenham Junction 01:26 and then continues on to Gillingham and sets down passengers only at Bromley South -01s36-, St Mary Cray-01s51-, Swanley-02s04-, Farningham Road-02s13-, Longfield-02s22-, Meopham-02s32-, Rochester-02s48- and Chatham-02s55- before terminating at Gillingham at 03:05. -note: s = stops to set down passengers only-.

Engineering work starting on 20/05/13 between Grove Park and Bromley North.

Track improvements and maintenance are taking place from 23:50 on 20/05/13 to 04:50 on 24/05/13 between Grove Park and Bromley North.

LATE NIGHT ALTERATIONS TO GROVE PARK / SUNDRIDGE PARK / BROMLEY NORTH TRAIN SERVICES: The following train services WILL NOT OPERATE: MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY. The 23:07 Grove Park to Bromley North. The 23:37 Grove Park to Bromley North. The 23:53 Bromley North to Grove Park. TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY. The 00:07 Grove Park to Bromley North. The 00:23 Bromley North to Grove Park. The 00:37 Grove Park to Bromley North. Passengers travelling between Grove Park, Sundridge Park and Bromley North are advised to travel by the following local bus routes: Grove Park to Bromley North - Travel from bus stop B by bus routes 126 and 261. Grove Park to Sundridge Park - Travel by bus routes 126 and 261 and change at Plaistow Green for route 314 to Sundridge Park. Sundridge Park to Bromley North. - Travel from bus stop B by bus route 314. Bromley North to Grove Park. - Travel by bus route 314 from Bromley Town Hall, bus stop MA. Bromley North to Sundridge Park. - Travel by bus route 314 from Bromley Town Hall, bus stop MA Valid train tickets will be accepted for travel on these local bus routes, in any direction between Grove Park, Sundridge Park and Bromley North.

Engineering work starting on 01/06/13 between Grove Park and Bromley North.

Track improvements and maintenance are taking place from 01:45 on 01/06/13 to 01:25 on 02/06/13 between Grove Park and Bromley North.

There are no train services operating between Grove Park, Sundridge Park and Bromley North. However, passengers can travel between these three stations on local bus routes 126 or 261. Valid train tickets will be accepted on these routes for travel in either direction between Grove Park, Sundridge Park and Bromley North.

Engineering work starting on 01/06/13 between Hither Green and Petts Wood.

Track improvements and maintenance are taking place from 01:45 on 01/06/13 to 01:25 on 02/06/13 between Hither Green and Petts Wood.

There are no train services calling at -in alphabetical order- Chislehurst, Grove Park or Elmstead Woods. However, there are replacement bus services, calling at these three stations, operating in each direction between Lewisham, Hither Green, Petts Wood and Orpington. As a result of this work, London Charing Cross/Ramsgate services are diverted to operate from London Victoria, calling additionally at Bromley South. Passengers using theses services can travel to London Charing Cross, London Waterloo East or London Bridge from London Victoria via London Underground services. Valid train tickets will be accepted for travel, in either direction and by any reasonable route between, Victoria, London Bridge, Waterloo, Southwark -for London Waterloo East-, Embankment -for London Charing Cross- and Charing Cross underground stations. Also, London Charing Cross/Hastings services will Depart from London 15 minutes EARLIER than scheduled, operate on a slightly different route and run to a revised timetable. There is unfortunately a reduction in the frequency of train services between London Charing Cross and Tunbridge Wells.This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Chelsfield, Dunton Green, Knockholt or Sevenoaks.

Engineering work starting on 02/06/13 between Hither Green and Petts Wood.

Track improvements and maintenance are taking place from 01:25 on 02/06/13 to 02:50 on 03/06/13 between Hither Green and Petts Wood.

There are no train services calling at -in alphabetical order- Chislehurst, Grove Park, Hither Green or Elmstead Woods. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham, Petts Wood and Orpington. As a result of this work, London Charing Cross/Ramsgate services are diverted to operate from London Victoria, calling additionally at Bromley South. Passengers using theses services can travel to London Charing Cross, London Waterloo East or London Bridge from London Victoria via London Underground services. Valid train tickets will be accepted for travel, in either direction and by any reasonable route between, Victoria, London Bridge, Waterloo, Southwark -for London Waterloo East-, Embankment -for London Charing Cross- and Charing Cross underground stations. Also, London Charing Cross/Hastings services will operate on a slightly different route and run to a revised timetable. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Chelsfield, Dunton Green, Knockholt or Sevenoaks.

Engineering work starting on 02/06/13 between London Waterloo East and London Bridge.

Track improvements and maintenance are taking place from 01:10 on 02/06/13 to 04:00 on 03/06/13 between London Waterloo East and London Bridge.

As a result of this work, train services scheduled to operate from London Charing Cross will be diverted, after calling at London Bridge, to operate from London Cannon Street. There is however, a train service operating every 15 minutes, in both directions between London Cannon Street, London Waterloo East and London Charing Cross. Also, there will unfortunately, be a reduction in the frequency of train services between London Bridge and Plumstead. Train services will operate as scheduled between London Bridge, South East London and Kent, unless affected by engineering work elsewhere. In particular, London Charing Cross/Ramsgate services are diverted to operate from London Victoria due to engineering work between Hither Green and Petts Wood.

Engineering work starting on 02/06/13 between Hither Green and Dartford.

Track improvements and maintenance are taking place from 01:25 on 02/06/13 to 02:50 on 03/06/13 between Hither Green and Dartford.

There are no train services calling at -in alphabetical order- Albany Park, Bexley, Crayford, Hither Green, Lee, Mottingham, New Eltham or Sidcup. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham and Dartford with a shuttle bus service between Sidcup and Albany Park. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Gravesend, Greenhithe -for Bluewater-, London Bridge, London Cannon Street, London Charing Cross, London Waterloo East, Northfleet, Stone Crossing or Swanscombe.

Engineering work starting on 02/06/13 between Folkestone Central and Deal.

Track improvements and maintenance are taking place from 01:40 on 02/06/13 to 03:30 on 03/06/13 between Folkestone Central and Deal.

There are no train services calling at Dover Priory, Martin Mill or Walmer. However, there are replacement bus services, calling at these three stations, operating in each direction between Folkestone Central and Deal. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Ashford International, Ebbsfleet International, Folkestone West, Headcorn, Hildenborough, London Bridge, London Cannon Street, London Charing Cross, London Waterloo East, Marden, Orpington, Paddock Wood, Pluckley, Sandling, Sevenoaks, Staplehurst, St Pancras International, Stratford International, Tonbridge or Westenhanger.

Engineering work starting on 02/06/13 between Canterbury East and Dover Priory.

Track improvements and maintenance are taking place from 01:40 on 02/06/13 to 03:30 on 03/06/13 between Canterbury East and Dover Priory.

There are no train services calling at -in alphabetical order- Adisham, Aylesham, Bekesbourne, Dover Priory, Kearsney, Shepherds Well or Snowdown. However, there are replacement bus services, calling at these stations, operating in each direction between Canterbury East and Dover Priory. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Bromley South, Chatham, Farningham Road, Faversham, Gillingham, London Victoria, Longfield, Meopham, Newington, Rainham, Rochester, Selling, Sittingbourne, Sole Street, St Mary Cray, Swanley or Teynham.

Engineering work starting on 02/06/13 between Maidstone East and Ashford International.

Track improvements and maintenance are taking place from 01:45 on 02/06/13 to 04:45 on 03/06/13 between Maidstone East and Ashford International.

There are no train services calling at -in alphabetical order- Bearsted, Charing, Harrietsham, Hollingbourne and Lenham. However, there are replacement bus services, calling at these stations, operating in each direction between Maidstone East and Ashford International. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Barming, Borough Green & Wrotham, Bromley South, East Malling, London Victoria, Otford, St Mary Cray, Swanley or West Malling.

Engineering work starting on 03/06/13 between Snowdown and Dover Priory.

Track improvements and maintenance are taking place from 23:50 on 03/06/13 to 03:50 on 07/06/13 between Snowdown and Dover Priory.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICES - THE 23:45 Faversham to Dover Priory -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY- This train service terminates at Canterbury East at 23:58. However, there is a connecting replacement bus service that departs from Canterbury East at 00:04 and calls at Aylesham at 00:19 and terminates at Dover Priory at 00:47.

Engineering work starting on 03/06/13 between Hither Green and Dartford.

Track improvements and maintenance are taking place from 00:25 on 03/06/13 to 04:45 on 07/06/13 between Hither Green and Dartford.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICES - THE 00:02 London Charing Cross to Dartford via Bexleyheath -TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY-. This train service is revised to depart 8 minutes LATER than scheduled from London Charing Cross at 00:10, and calls at London Waterloo East at 00:13, London Bridge 00:18, New Cross 00:23, Lewisham 00:27, Blackheath 00:30, Kidbrooke 00:33, Eltham 00:36, Falconwood 00:39, Welling 00:41 , Bexleyheath 00:44, Barnehurst 00;46 and terminates at Dartford at 00:53. - THE 00:10 London Charing Cross to Dartford via Sidcup -TUESDAY, WEDNESDAY, THURSDAY AND FRIDAY ONLY-. This train service WILL NOT OPERATE. Passengers travelling to Lee, Mottingham, New Eltham, Sidcup, Albany Park, Bexley or Crayford are advised to travel to Lewisham by the revised 00:02 London Charing Cross to Dartford via Bexleyheath train service -departing 8 minutes later than scheduled at 00:10- and change at Lewisham for a replacement bus service. This replacement bus service to Gillingham -Kent- departs from Lewisham at 00:35, and calls at Hither Green at 00:40, Lee 00:43, Mottingham 00:50, New Eltham 00:55, Sidcup 01:04, Albany Park -Footscray Lane- 01:08, Albany Park -Hurst Road / Valentine Avenue- 01:10, Bexley 01:13, Crayford 01:23, Dartford 01s31, Greenhithe 01s40, Gravesend 01s50, Higham 02s03, Strood 02s12,Rochester 02s16, Chatham 02s21 and terminates at Gillingham at 02:31. -Note: s = set down passengers only-.

Engineering work starting on 03/06/13 between Grove Park and Bromley North.

Track improvements and maintenance are taking place from 00:01 on 03/06/13 to 00:50 on 07/06/13 between Grove Park and Bromley North.

LATE NIGHT ALTERATIONS TO GROVE PARK / SUNDRIDGE PARK / BROMLEY NORTH TRAIN SERVICES: The following train services WILL NOT OPERATE: MONDAY AND TUESDAY ONLY - THE 23:37 Grove Park to Bromley North and THE 23:53 Bromley North to Grove Park. TUESDAY AND WEDNESDAY ONLY - THE 00:07 Grove Park to Bromley North, THE 00:23 Bromley North to Grove Park and THE 00:37 Grove Park to Bromley North. Passengers travelling between Grove Park, Sundridge Park and Bromley North are advised to travel by the following local bus routes: Grove Park to Bromley North - Travel from bus stop B by bus routes 126 or 261. Grove Park to Sundridge Park - Travel by bus routes 126 or 261 and change at Plaistow Green for route 314 to Sundridge Park. Sundridge Park to Bromley North - Travel from bus stop B by bus route 314. Sundridge Park to Grove Park - Travel by bus route 314, or walk, to Plaistow Green, bus stop C and change for bus routes 126 or 261. Bromley North to Grove Park - Walk to Bromley -West Street-, bus stop G, and travel by bus routes 126 or 261. Bromley North to Sundridge Park -Walk to Bromley -West Street-, bus stop GB, and travel by bus 314. Valid train tickets will be accepted for travel on these local bus routes, in any direction between Grove Park, Sundridge Park and Bromley North.

Engineering work starting on 03/06/13 between Folkestone Central and Deal.

Track improvements and maintenance are taking place from 23:50 on 03/06/13 to 03:50 on 07/06/13 between Folkestone Central and Deal.

ENGINEERING WORK WILL AFFECT THE FOLLOWING LATE NIGHT TRAIN SERVICES - THE 22:10 London Charing Cross to Ramsgate -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service terminates at Folkestone Central at 23:52. However, there is a connecting replacement bus service that departs from Folkestone Central at 23:59 and calls at Dover Priory at 00:20, Martin Mill 00:31, Walmer 00:39, Deal 00:47, Sandwich 01:00 and terminates at Ramsgate at 01:18. - THE 22:40 London Charing Cross to Dover Priory -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY-. This train service terminates at Folkestone Central at 00:20. However, there is a connecting replacement bus service that departs from Folkestone Central at 00:28 and arrives at Dover Priory at 00:48. - THE 23:10 London Charing Cross to Dover Priory -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY- This train service terminates at Folkestone Central at 00:52. However, there is a connecting replacement bus service that departs from Folkestone Central at 00:57 and terminates at Dover Priory at 01:17. - THE 23:12 London St Pancras to Ramsgate via Dover Priory -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY- This train service terminates at Folkestone Central at 00:07. However, there is a connecting replacement bus service that departs from Folkestone Central at 00:15 and calls at Dover Priory at 00:35, and sets down passengers only at Deal 00:55, Sandwich 01:08 and terminates at Ramsgate at 01:26. - THE 23:40 London Charing Cross to Dover Priory -MONDAY, TUESDAY, WEDNESDAY AND THURSDAY ONLY- This train service terminates at Folkestone Central at 01:20 However, there is a connecting replacement bus service that departs from Folkestone Central at 01:27 and terminates at Dover Priory at 01:47.

Engineering work starting on 09/06/13 between Maidstone East and Ashford International.

Track improvements and maintenance are taking place from 01:45 on 09/06/13 to 04:45 on 10/06/13 between Maidstone East and Ashford International.

There are no train services calling at -in alphabetical order- Bearsted, Charing, Harrietsham, Hollingbourne or Lenham. However, there are replacement bus services, calling at these stations, operating in each direction between Maidstone East and Ashford International. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Barming, Borough Green & Wrotham, Bromley South, East Malling, London Victoria, Otford, St Mary Cray, Swanley or West Malling.

Engineering work starting on 09/06/13 between Sidcup and Gravesend.

Track improvements and maintenance are taking place from 02:45 on 09/06/13 to 02:00 on 10/06/13 between Sidcup and Gravesend.

There are no train services calling at -in alphabetical order- Albany Park, Bexley, Crayford, Dartford, Greenhithe -for Bluewater-, Northfleet, Stone Crossing or Swanscombe. However, there are replacement bus services, calling at these stations, operating in each direction between Sidcup and Dartford; Dartford and Gravesend; with a shuttle bus service between Sidcup and Albany Park. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Abbey Wood, Blackheath, Charlton, Chatham, Gillingham, Higham, Hither Green, Lee, Lewisham, London Bridge, London Charing Cross, London Waterloo East, Mottingham, New Eltham, Rochester, Sidcup, Strood or Woolwich Arsenal.

Engineering work starting on 09/06/13 between Slade Green and Gravesend.

Track improvements and maintenance are taking place from 02:45 on 09/06/13 to 02:00 on 10/06/13 between Slade Green and Gravesend.

There are no train services calling at -in alphabetical order- Dartford, Greenhithe -for Bluewater-, Northfleet, Stone Crossing or Swanscombe. However, there are replacement bus services, calling at these stations, operating in each direction between Slade Green and Gravesend. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Abbey Wood, Barnehurst, Belvedere, Bexleyheath, Blackheath, Charlton, Chatham, Deptford, Eltham, Erith, Falconwood, Gillingham, Greenwich, Higham, Hither Green, Kidbrooke, Lee, Lewisham, London Bridge, London Charing Cross, London Waterloo East, Maze Hill, Mottingham, New Eltham, Plumstead, Rochester, Sidcup, Strood, Welling, Westcombe Park, Woolwich Arsenal or Woolwich Dockyard.

Engineering work starting on 09/06/13 between Ashford International and Canterbury West.

Track improvements and maintenance are taking place from 01:55 on 09/06/13 to 04:40 on 10/06/13 between Ashford International and Canterbury West.

There are no train services calling at -in alphabetical order- Canterbury West, Chartham, Chilham Minster, Sturry or Wye. However, there are replacement bus services, calling at these stations, operating in each direction between Ashford International and Ramsgate. IMPORTANT: Margate to St Pancras International via Ashford High Speed services WILL DEPART 14 MINUTES EARLIER than scheduled at 39 Minutes past each hour and run non-stop on a different route between Ramsgate and Ashford International. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Broadstairs, Ebbsfleet International, Headcorn, Hildenborough, London Bridge, London Charing Cross, London Waterloo East, Marden, Orpington, Pluckley, Paddock Wood, Sevenoaks, Staplehurst, Stratford International or Tonbridge.

Engineering work starting on 09/06/13 between Brixton and Bellingham.

Track improvements and maintenance are taking place from 01:20 on 09/06/13 to 09:20 on 09/06/13 between Brixton and Bellingham.

Until approximately 09:20, train services operating in both directions between London Blackfriars and Orpington/Sevenoaks will be diverted between Elephant & Castle and Bromley South to call additionally at Herne Hill and Beckenham Junction. These diverted services connect with replacement buses that are calling at the following stations -in alphabetical order-: Beckenham Hill, Beckenham Junction, Bellingham, Catford, Crofton Park, Denmark Hill, Herne Hill, Nunhead and Peckham Rye. IMPORTANT: As a result of this work the scheduled 08:21London Victoria to Canterbury East via Faversham- will depart from London Victoria 4 MINUTES EARLIER THAN SCHEDULED at 08:20. TRAIN SERVICES WILL RETURN TO NORMAL WHEN THIS WORK IS COMPLETE.

Engineering work starting on 16/06/13 between London Victoria and Denmark Hill.

Track improvements and maintenance are taking place from 01:30 on 16/06/13 to 03:15 on 17/06/13 between London Victoria and Denmark Hill.

London Victoria Station is closed to Southeastern train services. As a result all Mainline services will be diverted to operate from London Cannon Street calling additionally at London Bridge, but will not call at Bromley South. Passengers who wish to travel to or from Bromley South can do so by changing at Swanley for Metro train services. Passengers travelling to or from London Victoria can travel on London underground services from London Bridge or London Cannon Street. Valid train tickets will be accepted for travel, in either direction and by any reasonable route between Cannon Street, London Bridge and Victoria underground stations. This engineering work will affect all Mainline train services normally scheduled to operate from London Victoria.

Engineering work starting on 16/06/13 between London Victoria and Brixton.

Track improvements and maintenance are taking place from 01:30 on 16/06/13 to 03:15 on 17/06/13 between London Victoria and Brixton.

London Victoria Station is closed to Southeastern train services. As a result, London Victoria/Orpington Metro services are diverted to operate from London Blackfriars, but will not call at Brixton. Passengers planning to travel to or from London Victoria can travel between London Blackfriars and London Victoria by London Underground services. Passengers who wish to travel to or from Brixton can also use underground services. Valid train tickets will be accepted for travel, in either direction between Blackfriars, Victoria, Brixton and Elephant & Castle underground stations.

Engineering work starting on 16/06/13 between Ashford International and Dover Priory.

Track improvements and maintenance are taking place from 01:35 on 16/06/13 to 04:00 on 17/06/13 between Ashford International and Dover Priory.

There are no train services calling at -in alphabetical order- Folkestone Central, Folkestone West, Sandling or Westenhanger. However, there are replacement bus services, calling at these stations operating in each direction between Ashford International and Dover Priory. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Deal, Headcorn, Hildenborough, London Bridge, London Waterloo East, Marden, Martin Mill, Orpington, Paddock Wood, Pluckley, Ramsgate, Sandwich, Sevenoaks, Staplehurst, Tonbridge, Walmer, Westenhanger or Wye.

Engineering work starting on 16/06/13 between Sidcup and Dartford.

Track improvements and maintenance are taking place from 01:15 on 16/06/13 to 04:00 on 17/06/13 between Sidcup and Dartford.

There are no train services calling at Albany Park, Bexley or Crayford. However, there are replacement bus services, calling at these stations, operating in each direction between Sidcup and Dartford, with a shuttle bus service between Sidcup and Albany Park. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: Gravesend, Greenhithe -for Bluewater-, Hither Green, Lee, Lewisham, London Bridge, London Charing Cross, London Waterloo East, Mottingham, New Eltham, Northfleet, Stone Crossing or Swanscombe.

Engineering work starting on 16/06/13 between Lewisham and Hayes Kent.

Track improvements and maintenance are taking place from 01:20 on 16/06/13 to 04:00 on 17/06/13 between Lewisham and Hayes Kent.

There are no train services calling at -in alphabetical order- Catford Bridge, Clock House, Eden Park, Elmers End, Hayes, Ladywell, Lower Sydenham, New Beckenham or West Wickham. However, there are replacement bus services, calling at these stations, operating in each direction between Lewisham and Hayes. This engineering work may also affect journeys to and from the following stations -in alphabetical order-: London Bridge, London Charing Cross, London Waterloo East, New Cross or St Johns.

Engineering work starting on 16/06/13 between Gillingham Kent and Faversham.

Track improvements and maintenance are taking place from 01:35 on 16/06/13 to 07:20 on 16/06/13 between Gillingham Kent and Faversham.

Until approximately 07:20, buses replace trains between Gillingham, Rainham, Newington, Sittingbourne, Teynham and Faversham. PLEAS NOTE: the 06:58 Faversham to St Pancras International High Speed service will run 30 minutes LATER than scheduled and departs from Faversham at 07:28 and calls at Sittingbourne at 07:37, Rainham 07:45,Gillingham 07:50, Chatham 07:54, Rochester 07:57, Strood 08:02, Gravesend 08:13, Ebbsfleet International 08:16 and Stratford International at 08:29 before terminating at St Pancras International at 08:36. Train services will return to normal when this work is complete.