You are here: Home > Engineering work

Engineering work

Latest engineering work information

Engineering Work: Between London Bridge and London Cannon Street/Lon...

Planned engineering work will take place.
Between London Bridge and London Cannon Street/London Charing Cross
From 02:00, Friday 03 April 2015 to 23:59, Monday 06 April 2015.
Some lines are closed.
All services will be revised.
No Southeastern services will operate to or from Cannon Street, London Bridge, Charing Cross or Waterloo East.
Train services will start or terminate at New Cross, London Victoria or London Blackfriars.
Hastings services will operate via Tonbridge, Redhill and East Croydon, and run to and from platforms 10 or 11 at London Bridge.
Customer Advice:
Replacement buses will run between Lewisham and Charlton, calling at Deptford, Greenwich, Maze Hill and Westcombe Park
You ll be able to use the following routes at no extra cost to complete your journey;
> London Underground between our London terminals and between Southwark / Embankment and Canada Water
> London Overground between New Cross and Canada Water
> Docklands Light Railway between Lewisham & Greenwich.

Engineering Work: Between Swanley/Strood and Faversham

Good Friday and Easter Saturday planned engineering work will take place.
Between Swanley/Strood and Faversham
From 02:00, Friday 03 April 2015 to 04:00, Sunday 05 April 2015.
All lines are affected.
All services will be replaced by buses between Swanley and Faversham. There will be no trains between Swanley and Faversham and between Sittingbourne and Sheerness-on-Sea Trains to or from London Victoria will be diverted via Maidstone East to connect with replacement bus services.
High speed services to and from London St Pancras via Gravesend and Rochester will start and terminate at Strood and Faversham.
Replacement buses will run between Swanley/Maidstone East/Strood and Faversham. Replacement buses will also run between Sittingbourne and Sheerness-on-Sea.
.

Engineering Work: Between Deptford and Westcombe Park

Good Friday to Easter Monday (inclusive) planned engineering work will take place.
Between Deptford and Westcombe Park
From 02:00, Friday 03 April 2015 to 04:00, Tuesday 07 April 2015.
Some services will be replaced by buses between Lewisham and Charlton.

Engineering Work: Between Gravesend and Maidstone West

Easter Sunday and Easter Monday planned engineering work will take place.
Between Gravesend and Maidstone West
From 02:00, Sunday 05 April 2015 to 04:00, Tuesday 07 April 2015.
All services will be replaced by buses between Gravesend and Maidstone West.
Customer Advice:
Trains between Tonbridge and Strood will only run between Tonbridge and Maidstone West.
Trains which would normally run to and from London Cannon Street and Gillingham will be diverted to and from London Victoria and will start and terminate at Gravesend.
High speed services to and from London St Pancras via Gravesend and Rochester will start and terminate at Gravesend and Faversham.
Replacement buses services will run between Gravesend and Maidstone West.

Engineering Work: Between Sittingbourne and Sheerness-On-Sea

Good Friday to Easter Monday (inclusive) planned engineering work will take place.
Between Sittingbourne and Sheerness-On-Sea
From 02:00, Friday 03 April 2015 to 04:00, Tuesday 07 April 2015.
All services will be replaced by buses between Sittingbourne and Sheerness-On-Sea.

Engineering Work: Between Rainham Kt and Faversham/Sheerness-On-Sea

Planned engineering work will take place.
Between Rainham Kt and Faversham/Sheerness-On-Sea
From 02:00, Saturday 11 April 2015 to 02:00, Sunday 12 April 2015.
Some services will be replaced by buses between Rainham Kt and Faversham.
Some services will be replaced by buses between Sittingbourne and Sheerness-on-Sea.

Engineering Work: Between Gillingham Kent and Faversham/Sheerness-On-Sea

Planned engineering work will take place.
Between Gillingham Kent and Faversham/Sheerness-On-Sea
From 02:00, Sunday 12 April 2015 to 04:00, Monday 13 April 2015.
Some services will be replaced by buses between Gillingham Kent and Faversham.
Some services will be replaced by buses between Sittingbourne and Sheerness-on-Sea.

Engineering Work: Between Folkestone Central and Dover Priory

Planned engineering work will take place.
Between Folkestone Central and Dover Priory
From 02:00, Saturday 18 April 2015 to 04:00, Sunday 19 April 2015.
Some services will be replaced by buses between Folkestone Central and Dover Priory.

Engineering Work: Between Rainham Kt and Faversham/Sheerness-On-Sea

Planned engineering work will take place.
Between Rainham Kt and Faversham/Sheerness-On-Sea
From 02:00, Saturday 18 April 2015 to 04:00, Monday 20 April 2015.
Some services will be replaced by buses between Rainham Kt and Faversham.
Some services will be replaced by buses between Sittingbourne and Sheerness-on-Sea.

Engineering Work: Between Ashford International and Dover Priory

Planned engineering work will take place.
Between Ashford International and Dover Priory
From 02:00, Sunday 19 April 2015 to 04:00, Monday 20 April 2015.
Some services will be replaced by buses between Ashford International and Dover Priory.

Engineering Work: Between Tonbridge and Wadhurst

Planned engineering work will take place.
Between Tonbridge and Wadhurst
From 02:00, Sunday 19 April 2015 to 04:00, Monday 20 April 2015.
Some services will be replaced by buses between Tonbridge and Wadhurst.

Engineering Work: Between Dover Priory and Ramsgate

Planned engineering work will take place.
Between Dover Priory and Ramsgate
From 02:00, Saturday 25 April 2015 to 04:00, Sunday 26 April 2015.
Some services will be replaced by buses between Dover Priory and Ramsgate.

Engineering Work: Between Strood and Maidstone West

Planned engineering work will take place.
Between Strood and Maidstone West
From 02:00, Saturday 25 April 2015 to 02:00, Sunday 26 April 2015.
Some services will be replaced by buses between Strood and Maidstone West.

Engineering Work: Between Folkestone East and Deal/Canterbury East

Planned engineering work will take place.
Between Folkestone East and Deal/Canterbury East
From 02:00, Sunday 26 April 2015 to 04:00, Monday 27 April 2015.
Some services will be replaced by buses between Folkestone Central and Deal.
Some services will be replaced by buses between Canterbury East and Dover Priory.

Engineering Work: Between Strood and Paddock Wood

Planned engineering work will take place.
Between Strood and Paddock Wood
From 02:00, Sunday 26 April 2015 to 04:00, Monday 27 April 2015.
Some services will be replaced by buses between Strood and Paddock Wood.

Engineering Work: Between Sole Street/Strood and Gillingham Kent

Planned engineering work will take place.
Between Sole Street/Strood and Gillingham Kent
From 02:00, Saturday 02 May 2015 to 04:00, Tuesday 05 May 2015.
Some services will be replaced by buses between Meopham and Gillingham Kent.
Some services will be replaced by buses between Strood and Gillingham.

Engineering Work: Between Peckham Rye and Dartford via Lewisham and Bexl...

Planned engineering work will take place.
Between Peckham Rye and Dartford via Lewisham and Bexleyheath
From 02:00, Sunday 03 May 2015 to 04:00, Tuesday 05 May 2015.
Some services will be replaced by buses between Denmark Hill and Dartford.

Engineering Work: Between Sole Street/Strood and Faversham

Easter Sunday and Easter Monday planned engineering work will take place.
Between Sole Street/Strood and Faversham
From 02:00, Sunday 05 April 2015 to 04:00, Tuesday 07 April 2015.
All services will be replaced by buses between Meopham and Faversham.
Additional Information:
There will be no trains between Sole Street / Strood and Faversham.
Trains to and from London Victoria will be diverted via Maidstone East and Sole Street to connect with replacement buses.
High speed services to and from London St Pancras via Gravesend and Rochester will start and terminate at Gravesend and Faversham.

Engineering Work: Between Folkestone Central and Dover Priory

Planned engineering work will take place.
Between Folkestone Central and Dover Priory
On Tuesday, Wednesday and Thursday, from 00:20, Tuesday 07 April 2015 to 04:35, Friday 10 April 2015.
Some services will be replaced by buses throughout.
Additional Information:
Engineering work will affect the following late night train services:
.
The 22:40 London Charing Cross to Dover (Tuesday, Wednesday and Thursday only)
This train service will terminate at Folkestone Central at 00:21.
However, there is a replacement bus service to Dover Priory, departing Folkestone Central 00:31 and terminating at Dover Priory at 00:51.
The 23:37 St Pancras International to Ramsgate (Tuesday, Wednesday and Thursday only)
This high speed train service will operate as scheduled to arrive Ashford International at 00:14 and on departure at 00:15 this service is diverted to run non-stop to Ramsgate, arriving at 00:50. This train service will not call at Folkestone West, Folkestone Central, Dover Priory, Martin Mill, Walmer, Deal or Sandwich.
However, there is a replacement bus service from Ashford International departing at 00:22, calling at Folkestone West 00:47, Folkestone Central 00:50, Dover Priory 01:08, Martin Mill 01s20, Walmer 01s26, Deal 01s36, Sandwich 01s50 and terminates Ramsgate at 02:09. (Note: s = sets down passengers at the time indicated).
.
The 23:40 London Charing Cross to Dover (Tuesday, Wednesday and Thursday only)
This train service will terminate at Folkestone Central at 01:24.
However, there is a replacement bus service to Dover Priory, departing Folkestone Central 01:34 and terminates at Dover Priory at 01:54.

Engineering Work: Between Swanley and Rochester

Planned engineering work will take place.
Between Swanley and Rochester
On Tuesday, Wednesday, Thursday and Friday, from 00:10, Tuesday 07 April 2015 to 05:30, Friday 10 April 2015.
Some services will be replaced by buses throughout.
Additional Information:
Engineering work will affect the following late night train services:
.
The 23:34 London Victoria to Gillingham (Tuesday, Wednesday and Thursday)
This train service will terminate at Swanley at 00:08.
Passengers travelling to Farningham Road, Longfield, or Meopham should travel to Swanley and change for a replacement bus service that departs Swanley at 00:18 and calls at Farningham Road 00:27, Longfield 00:36, Meopham 00:46, Rochester 01:02, Chatham 01:09 before terminating at Gillingham at 01:19.
Passengers travelling to Sole Street should travel to Meopham and change for connecting minibus that departs from Meopham at 00:51 and arrives at Sole Street at 00:57.
.
The 00:07 London Victoria to Ramsgate
(Wednesday only)
This train service, on departure from London Victoria, is diverted via an alternative route and will run non-stop to Rochester 01:05 and is retimed to call at Chatham 01:08, Gillingham 01:12, Rainham 01:17, Newington 01s21, Sittingbourne 01:27, Teynham 01s31 and terminates at Faversham 01:38.
However, there are two connecting replacement bus services as follows:
Faversham depart at 01:47 calling at Margate 02s32, Broadstairs 02s42,Dumpton Park 02s27 and terminating at 02:53. ,
Faversham depart at Whitstable 01s48, calling at Whitstable at 02s08, Chestfield & Swalecliffe 02s16, Herne Bay 02s24, Birchington-on-Sea 02s44 and terminating at Westgate-on-Sea at 02: 49. Note: s = sets down passengers at the time indicated.
Please note: this train service will not set down passengers at Bromley South; passengers requiring Bromley South should travel by the scheduled 0022 London Victoria to Ashford International train service
(Thursday and Friday only)
This train service, on departure from London Victoria, is diverted via an alternative route and will run non-stop to Rochester 01:05 and is retimed to call at Chatham 01:08, Gillingham 01:12, Rainham 01:17, Newington 01s21, Sittingbourne 01:27, Teynham 01s31, Faversham 01:38, Whitstable 01s47, Chestfield & Swalecliffe 01s50, Herne Bay 01s54, Birchington-on-Sea 02s03, Westgate-on-Sea 02s06, Margate 02s10, Broadstairs 02s16, Dumpton Park 02s19 and terminates at Ramsgate at 02:23. (Note: s = sets down passengers at the time indicated).
Please note: this train service will not set down passengers at Bromley South; passengers requiring Bromley South should travel by the scheduled 00:22 London Victoria to Ashford International train service
.
The 00:37 London Victoria to Gillingham (Wednesday, Thursday and Friday only)
This train service will terminate at Swanley at 01:17.
Passengers travelling to Farningham Road, Longfield or Meopham should travel to Swanley and change for a replacement bus service that departs Swanley at 01:27 and calls at Farningham 01s36, Longfield 01s45, Meopham 01s55, Rochester 02s11, Chatham 02s18 before terminating at Gillingham at 02:28. (Note: s = sets down passengers at the time indicated).
Passengers travelling from London Victoria to Rochester, Chatham or Gillingham should travel by the additional train service that departs from London Victoria at 00:37, see below for details.
.
The 00:37 London Victoria to Gillingham (Wednesday, Thursday and Friday only)
This additional train service runs non-stop to Rochester at 01:32, Chatham 01:34 and terminates at Gillingham at 01:39.

Full website